Wraparound extensions · Sudbury

Wraparound extensions in Sudbury

We take on wraparound extensions in Sudbury as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Sudbury

Sudbury sits 18 miles west of Ipswich, with Colchester 13 miles to the south-east and Haverhill 13 miles to the west.

Homes in the East of England

Housing in the East of England ranges from post-war estates and modern developments to timber-framed and period homes in historic towns, so permitted development checks and conservation controls both feature regularly.

What do you get with a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped build, giving the biggest possible ground-floor space on terraced and semi-detached houses. It usually creates a large open-plan kitchen, dining and living area across the back of the house.

  • Steel frame or goalpost for the corner opening
  • Pitched, flat or glazed roof with rooflights
  • Glazing, insulation, plastering and electrics

What is the guide price for a wraparound extension in Sudbury?

What wraparound extensions typically cost. These are guide ranges; the written quote for your house replaces them.

Wraparound extensionsGuide price incl. VAT
Standard specification£3,400 to £3,800 per m²
Good specification£3,800 to £4,250 per m²
High specification£4,250 to £4,700 per m²

Planning and building rules in Sudbury

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development. Most need householder planning permission, which usually takes around eight weeks once validated.

What should I think about before starting?

  • The corner steel connection is the critical detail and is designed by a structural engineer.
  • An open-plan space this size needs a heating plan, often underfloor heating.

How does the project run?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Questions about a wraparound extension in Sudbury

How long does a wraparound take?

Around 12 to 18 weeks on site after approvals.

Can we keep part of the kitchen working?

Often, by sequencing the work so the old back wall comes out last. We agree a plan with you before starting.

How do I get a price for wraparound extensions in Sudbury?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Other towns nearby

Learn more about wraparound extensions, or see every project we cover in Sudbury.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote