Covering Ulverston
Our coverage around Ulverston (LA12) also includes Barrow-in-Furness, Morecambe and Lancaster.
Projects in Cumbria are taken on by arrangement, and any travel and accommodation costs for the team are shown openly in the quote.
Homes in the North West
Across the North West, Victorian terraces, inter-war semis and modern estates all feature, and brick or stone matching is chosen to suit each street.
What is included in a wraparound extension in Ulverston?
Because it removes two external walls, a wraparound needs careful structural design and a good plan for the corner where the steels meet. We design, apply for any permissions, build and finish the shell, and can fit the kitchen as part of the same contract.
- Steel frame or goalpost for the corner opening
- Glazing, insulation, plastering and electrics
- Optional kitchen supply and installation
How much does a wraparound extension cost in Ulverston?
Typical ranges for wraparound extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Wraparound extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £3,400 to £3,800 per m² |
| Good specification | £3,800 to £4,250 per m² |
| High specification | £4,250 to £4,700 per m² |
Planning and building rules in Ulverston
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development.
What should Ulverston homeowners check first?
- Both neighbours may need party wall notices.
- An open-plan space this size needs a heating plan, often underfloor heating.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Wraparound extensions: common questions
Does a wraparound need planning permission?
Usually yes. In England it combines a side and rear extension, which takes it outside permitted development in most cases.
How long does a wraparound take?
Around 12 to 18 weeks on site after approvals.
Do you work in Ulverston?
Yes. Ulverston is within our coverage for wraparound extensions, along with nearby Barrow-in-Furness and Morecambe.
Other towns nearby
- Wraparound extensions in Barrow-in-Furness
- Wraparound extensions in Morecambe
- Wraparound extensions in Lancaster
- Wraparound extensions in Kendal
Learn more about wraparound extensions, or see every project we cover in Ulverston.

