Wraparound extensions · West Bromwich

Wraparound extensions in West Bromwich

We take on wraparound extensions in West Bromwich as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering West Bromwich

Our coverage around West Bromwich (B70) also includes Smethwick, Tipton and Dudley.

Homes in the West Midlands

Red-brick terraces and inter-war semis make up much of the housing in the West Midlands, which suits rear extensions, dormer lofts and hip-to-gable conversions, with more modern estates on the edges of the towns.

What does a wraparound extension involve?

Because it removes two external walls, a wraparound needs careful structural design and a good plan for the corner where the steels meet. We design, apply for any permissions, build and finish the shell, and can fit the kitchen as part of the same contract.

  • Design, planning drawings and structural calculations
  • Party wall process with both neighbours if needed
  • Steel frame or goalpost for the corner opening

How much should I budget for a wraparound extension?

Typical ranges for wraparound extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Wraparound extensionsGuide price incl. VAT
Standard specification£3,400 to £3,800 per m²
Good specification£3,800 to £4,250 per m²
High specification£4,250 to £4,700 per m²

Do you need permission for a wraparound extension in West Bromwich?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development. Most need householder planning permission, which usually takes around eight weeks once validated.

What should West Bromwich homeowners check first?

  • Roof water from an L-shape needs careful falls and outlets.
  • An open-plan space this size needs a heating plan, often underfloor heating.

What are the steps?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

What people ask before starting

How long does a wraparound take?

Around 12 to 18 weeks on site after approvals.

Glazed roof or solid roof?

A mix usually works best: solid roof with rooflights over the kitchen and a glazed section over the dining area.

Do you work in West Bromwich?

Yes. West Bromwich is within our coverage for wraparound extensions, along with nearby Smethwick and Tipton.

Other towns nearby

Learn more about wraparound extensions, or see every project we cover in West Bromwich.