Wraparound extensions · West Sussex

Wraparound extensions in West Sussex

Homeowners across West Sussex can get wraparound extensions from one company: the design, the council approvals and the building work.

Covering West Sussex

Our coverage across West Sussex includes Crawley, Worthing, Bognor Regis and Littlehampton.

Homes in the South East

The South East has a lot of 1930s and post-war semi-detached housing, well suited to rear extensions and hip-to-gable loft conversions, alongside period properties in conservation areas that need a more careful design.

What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped build, giving the biggest possible ground-floor space on terraced and semi-detached houses. It usually creates a large open-plan kitchen, dining and living area across the back of the house.

  • Party wall process with both neighbours if needed
  • Steel frame or goalpost for the corner opening
  • Pitched, flat or glazed roof with rooflights

What will a wraparound extension cost?

Guide prices for wraparound extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Wraparound extensionsGuide price incl. VAT
Standard specification£3,400 to £3,800 per m²
Good specification£3,800 to £4,250 per m²
High specification£4,250 to £4,700 per m²

Do you need permission for a wraparound extension in West Sussex?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development.

What can affect a wraparound extension?

  • Both neighbours may need party wall notices.
  • An open-plan space this size needs a heating plan, often underfloor heating.

What are the steps?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

What people ask before starting

Does a wraparound need planning permission?

Usually yes. In England it combines a side and rear extension, which takes it outside permitted development in most cases.

How long does a wraparound take?

Around 12 to 18 weeks on site after approvals.

Can you visit a house in West Sussex to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Also covering

Learn more about wraparound extensions, or see every project we cover in West Sussex.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote