Architectural design and planning · Halesowen

Architectural design and planning in Halesowen

Homeowners in Halesowen can get architectural design and planning from one company: the design, the paperwork and the building work sit with us rather than with three separate firms.

Covering Halesowen

Alongside Halesowen, we also cover Bartley Green, Brierley Hill (4 miles to the north-west) and Dudley.

Homes in the West Midlands

The West Midlands has a large stock of 1930s semis and Victorian terraces in red brick, so matching brick and roof tiles is often the key to an extension that looks original.

What is included in architectural design and planning in Halesowen?

Architectural design and planning covers everything before building starts: a measured survey of the house, design options, planning or permitted development drawings, the application itself, building regulations drawings and structural calculations. We offer it on its own or as part of a design-and-build project.

  • Design options and 3D views
  • Planning or lawful development certificate drawings
  • Submission and liaison with the planning officer

How much does architectural design and planning cost in Halesowen?

Guide prices for architectural design and planning, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Architectural design and planningGuide price incl. VAT
Measured survey and existing drawings£500 to £1,200
Planning drawings and application£1,200 to £3,000
Building regulations drawings and specification£1,000 to £2,500
Structural calculations£500 to £2,000

What approvals does architectural design and planning need in England?

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

We confirm whether your project is permitted development, needs prior approval or needs a householder application, and prepare the right submission. A lawful development certificate is the best proof that permitted development work is lawful.

What should I think about before starting?

  • Planning and building regulations are separate approvals; most projects need building regulations even when planning is not needed.
  • Pre-application advice from the council can help on sensitive sites.

How does the project run?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

What people ask before starting

How long does planning take?

Councils aim to decide householder applications within eight weeks of validation.

Do I need a structural engineer?

For steels, new openings, lofts and extensions, yes. We arrange the calculations.

Who deals with the council for a project in Halesowen?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Architectural design and planning near Halesowen

Learn more about architectural design and planning, or see every project we cover in Halesowen.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote