Architectural design and planning · Stourbridge

Architectural design and planning in Stourbridge

Architectural design and planning for homes in Stourbridge and the surrounding parts of the West Midlands, designed around your house and built by our teams under a single written contract.

Covering Stourbridge

Alongside Stourbridge, we also cover Brierley Hill, Dudley (4 miles to the north-east) and Halesowen.

Homes in the West Midlands

Red-brick terraces and inter-war semis make up much of the housing in the West Midlands, which suits rear extensions, dormer lofts and hip-to-gable conversions, with more modern estates on the edges of the towns.

What do you get with architectural design and planning?

Architectural design and planning covers everything before building starts: a measured survey of the house, design options, planning or permitted development drawings, the application itself, building regulations drawings and structural calculations. We offer it on its own or as part of a design-and-build project.

  • Measured survey of the existing house
  • Planning or lawful development certificate drawings
  • Structural engineer’s calculations

What is the guide price for architectural design and planning in Stourbridge?

Use these ranges to budget for architectural design and planning; the survey turns them into a fixed price for the agreed specification.

Architectural design and planningGuide price incl. VAT
Measured survey and existing drawings£500 to £1,200
Planning drawings and application£1,200 to £3,000
Building regulations drawings and specification£1,000 to £2,500
Structural calculations£500 to £2,000

Do you need permission for architectural design and planning in Stourbridge?

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

We confirm whether your project is permitted development, needs prior approval or needs a householder application, and prepare the right submission. A lawful development certificate is the best proof that permitted development work is lawful.

What can change the price or programme?

  • Planning and building regulations are separate approvals; most projects need building regulations even when planning is not needed.
  • Pre-application advice from the council can help on sensitive sites.

From first call to completion

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Questions about architectural design and planning in Stourbridge

How much do extension plans cost?

Typically £3,000 to £7,000 including VAT from measured survey to building regulations drawings, plus council fees.

How long does planning take?

Councils aim to decide householder applications within eight weeks of validation.

Do you work in Stourbridge?

Yes. Stourbridge is within our coverage for architectural design and planning, along with nearby Brierley Hill and Dudley.

Also covering

Learn more about architectural design and planning, or see every project we cover in Stourbridge.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote