Bungalow and upward extensions · Barking

Bungalow and upward extensions in Barking

From the first site visit to the final building control sign-off, we manage bungalow and upward extensions in Barking so you only have one company to deal with.

Covering Barking

We work in Barking (IG11) and the places around it, including Ilford, Becontree and Thamesmead.

Homes in London

London projects often mean working on period terraces with neighbours on both sides, tight access through the house and conservation area controls, so careful planning and party wall work matter as much as the build.

What is included in an upward extension in Barking?

An upward extension adds a new storey on top of an existing house, most often turning a bungalow into a two-storey or chalet-style home. It can double the floor area without using any of the garden.

  • Structural survey of walls and foundations
  • Design and planning or prior approval application
  • Roof removal and temporary weather protection

What is the guide price for an upward extension in Barking?

Use these ranges to budget for bungalow and upward extensions; the survey turns them into a fixed price for the agreed specification.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

What approvals does an upward extension need in England?

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.

What can change the price or programme?

  • Some bungalow foundations need strengthening before a storey can be added.
  • The staircase takes space from the ground floor plan.

What are the steps?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Questions about an upward extension in Barking

Can I add a first floor to my bungalow?

Often yes, if the walls and foundations can carry the load and planning allows. We check the structure first.

How long does it take?

About 12 to 24 weeks on site.

Who deals with the council for a project in Barking?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Other towns nearby

Learn more about bungalow and upward extensions, or see every project we cover in Barking.