Bungalow and upward extensions · Burntwood

Bungalow and upward extensions in Burntwood

Planning bungalow and upward extensions in Burntwood? We design and build them for houses across Staffordshire, and we fix the price for the agreed specification in writing before any building work starts.

Covering Burntwood

Our coverage around Burntwood (WS7) also includes Lichfield, Cannock and Aldridge.

Homes in the West Midlands

The West Midlands has a large stock of 1930s semis and Victorian terraces in red brick, so matching brick and roof tiles is often the key to an extension that looks original.

What goes into an upward extension?

The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.

  • Roof removal and temporary weather protection
  • New first-floor structure, walls and roof
  • Staircase and changes to the ground floor layout

How much does an upward extension cost in Burntwood?

Typical ranges for bungalow and upward extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

Do you need permission for an upward extension in Burntwood?

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters. Houses in conservation areas and other protected land need full planning permission, as do most chalet conversions with front dormers.

What can affect an upward extension?

  • Some bungalow foundations need strengthening before a storey can be added.
  • The house is exposed while the roof is off, so the sequence is planned tightly.

What are the steps?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

What people ask before starting

Can I add a first floor to my bungalow?

Often yes, if the walls and foundations can carry the load and planning allows. We check the structure first.

Is an upward extension permitted development?

In England, Class AA allows it on many post-1948 houses through a prior approval application. Elsewhere planning permission is needed.

Can you visit a house in Burntwood to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Other towns nearby

Learn more about bungalow and upward extensions, or see every project we cover in Burntwood.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote