Bungalow and upward extensions · Chingford

Bungalow and upward extensions in Chingford

Planning bungalow and upward extensions in Chingford? We design and build them for houses across London, and we fix the price for the agreed specification in writing before any building work starts.

Covering Chingford

We work in Chingford (E4) and the places around it, including Woodford Green, Edmonton and Walthamstow.

Homes in London

London projects often mean working on period terraces with neighbours on both sides, tight access through the house and conservation area controls, so careful planning and party wall work matter as much as the build.

What is included in an upward extension in Chingford?

The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.

  • Structural survey of walls and foundations
  • New first-floor structure, walls and roof
  • Full fit-out of the new rooms

How much should I budget for an upward extension?

What bungalow and upward extensions typically cost. These are guide ranges; the written quote for your house replaces them.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

How is an upward extension approved in Chingford?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.

What can change the price or programme?

  • Some bungalow foundations need strengthening before a storey can be added.
  • Neighbours’ light and privacy are the main planning tests.

What happens after I enquire?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Your questions answered

Is an upward extension permitted development?

In England, Class AA allows it on many post-1948 houses through a prior approval application. Elsewhere planning permission is needed.

How long does it take?

About 12 to 24 weeks on site.

Can you visit a house in Chingford to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Bungalow and upward extensions near Chingford

Learn more about bungalow and upward extensions, or see every project we cover in Chingford.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote