Covering Kingswood
Our coverage around Kingswood (BS15) also includes Yate, Bath and Portishead.
Homes in the South West
Homes in the South West range from coastal and rural properties in stone and slate to city terraces and modern estates, so extensions are designed to match the local materials.
What do you get with an upward extension?
The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.
- Structural survey of walls and foundations
- Roof removal and temporary weather protection
- Full fit-out of the new rooms
How much does an upward extension cost in Kingswood?
Typical ranges for bungalow and upward extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Bungalow and upward extensions | Guide price incl. VAT |
|---|---|
| Chalet conversion with dormers (total) | £45,000 to £85,000 |
| New first floor, standard specification | £2,200 to £2,800 per m² |
| New first floor, good specification | £2,800 to £3,300 per m² |
| New first floor, high specification | £3,300 to £3,800 per m² |
Do you need permission for an upward extension in Kingswood?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters. Houses in conservation areas and other protected land need full planning permission, as do most chalet conversions with front dormers.
What should I think about before starting?
- Some bungalow foundations need strengthening before a storey can be added.
- The house is exposed while the roof is off, so the sequence is planned tightly.
From first call to completion
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Your questions answered
Can I add a first floor to my bungalow?
Often yes, if the walls and foundations can carry the load and planning allows. We check the structure first.
Do we need to move out?
Often for part of the job, while the roof is off and the new floor is formed. We plan this with you.
Do you work in Kingswood?
Yes. Kingswood is within our coverage for bungalow and upward extensions, along with nearby Yate and Bath.
Other towns nearby
- Bungalow and upward extensions in Yate
- Bungalow and upward extensions in Bath
- Bungalow and upward extensions in Portishead
- Bungalow and upward extensions in Corsham
Learn more about bungalow and upward extensions, or see every project we cover in Kingswood.

