Bungalow and upward extensions · Yate

Bungalow and upward extensions in Yate

If you live in Yate and want bungalow and upward extensions, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering Yate

Yate is about 24 miles south of Gloucester. We also cover Kingswood (7 miles to the south-west), Bath and Corsham.

Homes in the South West

Homes in the South West range from coastal and rural properties in stone and slate to city terraces and modern estates, so extensions are designed to match the local materials.

What is an upward extension?

An upward extension adds a new storey on top of an existing house, most often turning a bungalow into a two-storey or chalet-style home. It can double the floor area without using any of the garden.

  • Roof removal and temporary weather protection
  • New first-floor structure, walls and roof
  • Staircase and changes to the ground floor layout

How much should I budget for an upward extension?

Typical ranges for bungalow and upward extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

Do you need permission for an upward extension in Yate?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.

What can affect an upward extension?

  • Some bungalow foundations need strengthening before a storey can be added.
  • Neighbours’ light and privacy are the main planning tests.

From first call to completion

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Your questions answered

Can I add a first floor to my bungalow?

Often yes, if the walls and foundations can carry the load and planning allows. We check the structure first.

How long does it take?

About 12 to 24 weeks on site.

Can you visit a house in Yate to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Bungalow and upward extensions near Yate

Learn more about bungalow and upward extensions, or see every project we cover in Yate.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote