What does an upward extension involve?
An upward extension adds a new storey on top of an existing house, most often turning a bungalow into a two-storey or chalet-style home. It can double the floor area without using any of the garden.
- Structural survey of walls and foundations
- Design and planning or prior approval application
- Staircase and changes to the ground floor layout
How much should I budget for an upward extension?
Use these ranges to budget for bungalow and upward extensions; the survey turns them into a fixed price for the agreed specification.
| Bungalow and upward extensions | Guide price incl. VAT |
|---|---|
| Chalet conversion with dormers (total) | £45,000 to £85,000 |
| New first floor, standard specification | £2,200 to £2,800 per m² |
| New first floor, good specification | £2,800 to £3,300 per m² |
| New first floor, high specification | £3,300 to £3,800 per m² |
Planning and building rules in Leamington Spa
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.
What should I think about before starting?
- The house is exposed while the roof is off, so the sequence is planned tightly.
- Neighbours’ light and privacy are the main planning tests.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Bungalow and upward extensions: common questions
Can I add a first floor to my bungalow?
Often yes, if the walls and foundations can carry the load and planning allows. We check the structure first.
How long does it take?
About 12 to 24 weeks on site.
Who deals with the council for a project in Leamington Spa?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Other towns nearby
- Bungalow and upward extensions in Warwick
- Bungalow and upward extensions in Kenilworth
- Bungalow and upward extensions in Coventry
- Bungalow and upward extensions in Stratford-upon-Avon
Learn more about bungalow and upward extensions, or see every project we cover in Leamington Spa.