Bungalow and upward extensions · Warwickshire

Bungalow and upward extensions in Warwickshire

Bungalow and upward extensions across Warwickshire, designed and built by SK Residential under one contract. We handle the survey, drawings, approvals and construction.

Covering Warwickshire

We cover Warwickshire, including Nuneaton, Rugby, Leamington Spa and Warwick, and the towns around them.

Homes in the West Midlands

Across the West Midlands, terraced and semi-detached houses in red brick are typical, along with post-war estates where garage conversions and side extensions are popular.

What is included in an upward extension in Warwickshire?

The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.

  • Design and planning or prior approval application
  • New first-floor structure, walls and roof
  • Staircase and changes to the ground floor layout

What will an upward extension cost?

What bungalow and upward extensions typically cost. These are guide ranges; the written quote for your house replaces them.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

Do you need permission for an upward extension in Warwickshire?

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.

What should I think about before starting?

  • Some bungalow foundations need strengthening before a storey can be added.
  • Neighbours’ light and privacy are the main planning tests.

What are the steps?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Your questions answered

Is an upward extension permitted development?

In England, Class AA allows it on many post-1948 houses through a prior approval application. Elsewhere planning permission is needed.

How long does it take?

About 12 to 24 weeks on site.

How do I get a price for bungalow and upward extensions in Warwickshire?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Bungalow and upward extensions in nearby towns

Learn more about bungalow and upward extensions, or see every project we cover in Warwickshire.