Bungalow and upward extensions · Nottinghamshire

Bungalow and upward extensions in Nottinghamshire

We design and build bungalow and upward extensions throughout Nottinghamshire, with a fixed price in writing for the agreed specification and one point of contact.

Covering Nottinghamshire

Our coverage across Nottinghamshire includes Nottingham, Mansfield, Worksop and Newark-on-Trent.

Homes in the East Midlands

Housing in the East Midlands includes Victorian terraces, inter-war semis and newer estates, with stone-built villages in some areas where conservation controls apply.

What do you get with an upward extension?

The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.

  • Design and planning or prior approval application
  • Staircase and changes to the ground floor layout
  • Full fit-out of the new rooms

What will an upward extension cost?

Typical ranges for bungalow and upward extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

How is an upward extension approved in Nottinghamshire?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.

What should Nottinghamshire homeowners check first?

  • Some bungalow foundations need strengthening before a storey can be added.
  • The house is exposed while the roof is off, so the sequence is planned tightly.

What are the steps?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Your questions answered

Is an upward extension permitted development?

In England, Class AA allows it on many post-1948 houses through a prior approval application. Elsewhere planning permission is needed.

Do we need to move out?

Often for part of the job, while the roof is off and the new floor is formed. We plan this with you.

Do you work in Nottinghamshire?

Yes. Nottinghamshire is within our coverage for bungalow and upward extensions, along with nearby Nottingham and Mansfield.

Also covering

Learn more about bungalow and upward extensions, or see every project we cover in Nottinghamshire.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote