If you live in Worksop and want bungalow and upward extensions, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering Worksop

Worksop sits 24 miles north of Nottingham, with Retford 8 miles to the east and Staveley 10 miles to the west.

Homes in the East Midlands

Across the East Midlands you find everything from city terraces to modern estates and stone villages, so the right extension depends a lot on the street and the materials around it.

What is included in an upward extension in Worksop?

An upward extension adds a new storey on top of an existing house, most often turning a bungalow into a two-storey or chalet-style home. It can double the floor area without using any of the garden.

  • Design and planning or prior approval application
  • Roof removal and temporary weather protection
  • Staircase and changes to the ground floor layout

What will an upward extension cost?

What bungalow and upward extensions typically cost. These are guide ranges; the written quote for your house replaces them.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

What approvals does an upward extension need in England?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters. Houses in conservation areas and other protected land need full planning permission, as do most chalet conversions with front dormers.

What should Worksop homeowners check first?

  • Some bungalow foundations need strengthening before a storey can be added.
  • The house is exposed while the roof is off, so the sequence is planned tightly.

From first call to completion

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Bungalow and upward extensions: common questions

Can I add a first floor to my bungalow?

Often yes, if the walls and foundations can carry the load and planning allows. We check the structure first.

How long does it take?

About 12 to 24 weeks on site.

Can you visit a house in Worksop to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Bungalow and upward extensions in nearby towns

Learn more about bungalow and upward extensions, or see every project we cover in Worksop.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote