Bungalow and upward extensions · Wimbledon

Bungalow and upward extensions in Wimbledon

Bungalow and upward extensions for homes in Wimbledon and the surrounding parts of London, designed around your house and built by our teams under a single written contract.

Covering Wimbledon

Our coverage around Wimbledon (SW19) also includes Morden (2 miles to the south) and Mitcham.

Homes in London

Much of London’s housing is Victorian and Edwardian terraces, which is why side return extensions, rear dormers and mansards are so common. Many streets are in conservation areas, and several boroughs use Article 4 directions that remove some permitted development rights.

What is an upward extension?

The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.

  • Roof removal and temporary weather protection
  • New first-floor structure, walls and roof
  • Staircase and changes to the ground floor layout

What will an upward extension cost?

Guide prices for bungalow and upward extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

How is an upward extension approved in Wimbledon?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.

What can affect an upward extension?

  • The staircase takes space from the ground floor plan.
  • The house is exposed while the roof is off, so the sequence is planned tightly.

How does the project run?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

Can I add a first floor to my bungalow?

Often yes, if the walls and foundations can carry the load and planning allows. We check the structure first.

How long does it take?

About 12 to 24 weeks on site.

How do I get a price for bungalow and upward extensions in Wimbledon?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Bungalow and upward extensions near Wimbledon

Learn more about bungalow and upward extensions, or see every project we cover in Wimbledon.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote