Covering Coventry
Our coverage around Coventry (CV1) also includes Kenilworth (5 miles to the south-west) and Bedworth.
Homes in the West Midlands
Red-brick terraces and inter-war semis make up much of the housing in the West Midlands, which suits rear extensions, dormer lofts and hip-to-gable conversions, with more modern estates on the edges of the towns.
What is included in a double-storey extension in Coventry?
Two-storey work has to sit comfortably with the house and the neighbours, so most of the design effort goes into the roofline, window positions and how the new first floor connects to the landing. We handle the planning application, the structural design and the building control process, then build, roof and finish both floors.
- Measured survey, design and planning drawings
- Foundations, steelwork, brick and block walls, roof
- Joining the new first floor to the existing landing
How much should I budget for a double-storey extension?
Indicative costs for double-storey extensions. London and the South East usually sit towards the top of each range.
| Double-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,850 per m² |
Planning and building rules in Coventry
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission. Expect around eight weeks for a decision once the application is validated.
What can affect a double-storey extension?
- Neighbours’ light is assessed using the 45-degree guide many councils use.
- The first-floor link can mean moving a bathroom or reshaping the landing.
What happens after I enquire?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Double-storey extensions: common questions
Is a two-storey extension better value than a single-storey one?
Per square metre, usually yes, because the foundations and roof serve two floors of space.
How long does a two-storey extension take?
Around 14 to 24 weeks on site, plus the planning period before that.
Do you work in Coventry?
Yes. Coventry is within our coverage for double-storey extensions, along with nearby Kenilworth and Bedworth.
Double-storey extensions in nearby towns
- Double-storey extensions in Kenilworth
- Double-storey extensions in Bedworth
- Double-storey extensions in Nuneaton
- Double-storey extensions in Leamington Spa
Learn more about double-storey extensions, or see every project we cover in Coventry.

