Covering Leamington Spa
Leamington Spa is about 17 miles south of Nuneaton. We also cover Warwick (3 miles to the west), Kenilworth and Coventry.
Homes in the West Midlands
The West Midlands has a large stock of 1930s semis and Victorian terraces in red brick, so matching brick and roof tiles is often the key to an extension that looks original.
What do you get with a double-storey extension?
A double-storey extension adds new rooms on both the ground and first floor in one build, typically a larger kitchen or living space downstairs and an extra bedroom or bathroom above. Because the roof and foundations are shared, the cost per square metre is usually lower than a single-storey extension.
- Householder planning application
- Foundations, steelwork, brick and block walls, roof
- Windows, insulation, plastering, electrics and plumbing
How much should I budget for a double-storey extension?
Use these ranges to budget for double-storey extensions; the survey turns them into a fixed price for the agreed specification.
| Double-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,850 per m² |
Do you need permission for a double-storey extension in Leamington Spa?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission. Expect around eight weeks for a decision once the application is validated.
What can change the price or programme?
- Side extensions close to a boundary are often set back or stepped down so they do not create a terraced effect.
- The new roof is tied into the old one, so roof tiles and ridge details need to match.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Double-storey extensions: common questions
How long does a two-storey extension take?
Around 14 to 24 weeks on site, plus the planning period before that.
Will we need to move out?
Most people stay. The noisiest stage is when we break through into the existing first floor, which we plan for a short window.
How do I get a price for double-storey extensions in Leamington Spa?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Other towns nearby
- Double-storey extensions in Warwick
- Double-storey extensions in Kenilworth
- Double-storey extensions in Coventry
- Double-storey extensions in Stratford-upon-Avon
Learn more about double-storey extensions, or see every project we cover in Leamington Spa.

