Covering Greenock
We work in Greenock (PA15, PA16) and the places around it, including Vale of Leven, Largs and Clydebank.
Homes in Renfrewshire and Inverclyde
Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.
What goes into a double-storey extension?
Two-storey work has to sit comfortably with the house and the neighbours, so most of the design effort goes into the roofline, window positions and how the new first floor connects to the landing. We handle the planning application, the structural design and the building control process, then build, roof and finish both floors.
- Building warrant application and completion certificate
- Foundations, steelwork, brick and block walls, roof
- Windows, insulation, plastering, electrics and plumbing
What is the guide price for a double-storey extension in Greenock?
Typical ranges for double-storey extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Double-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,850 per m² |
How is a double-storey extension approved in Greenock?
In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.
Two-storey extensions in Scotland almost always need planning permission, and a building warrant must be granted before work starts.
What can affect a double-storey extension?
- Neighbours’ light is assessed using the 45-degree guide many councils use.
- The new roof is tied into the old one, so roof tiles and ridge details need to match.
From first call to completion
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
How long does a two-storey extension take?
Around 14 to 24 weeks on site, plus the planning period before that.
Will we need to move out?
Most people stay. The noisiest stage is when we break through into the existing first floor, which we plan for a short window.
How do I get a price for double-storey extensions in Greenock?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Other towns nearby
- Double-storey extensions in Vale of Leven
- Double-storey extensions in Largs
- Double-storey extensions in Clydebank
- Double-storey extensions in Paisley
Learn more about double-storey extensions, or see every project we cover in Greenock.

