Double-storey extensions · Vale of Leven

Double-storey extensions in Vale of Leven

Planning double-storey extensions in Vale of Leven? We design and build them for houses across Dunbartonshire, and we fix the price for the agreed specification in writing before any building work starts.

Covering Vale of Leven

Alongside Vale of Leven, we also cover Greenock, Clydebank (8 miles to the south-east) and Renfrew.

Homes in Dunbartonshire

In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.

What do you get with a double-storey extension?

Two-storey work has to sit comfortably with the house and the neighbours, so most of the design effort goes into the roofline, window positions and how the new first floor connects to the landing. We handle the planning application, the structural design and the building control process, then build, roof and finish both floors.

  • Structural engineer’s design and calculations
  • Windows, insulation, plastering, electrics and plumbing
  • Joining the new first floor to the existing landing

What is the guide price for a double-storey extension in Vale of Leven?

Typical ranges for double-storey extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Double-storey extensionsGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,850 per m²

Planning and building rules in Vale of Leven

In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.

Two-storey extensions in Scotland almost always need planning permission, and a building warrant must be granted before work starts.

What can change the price or programme?

  • Neighbours’ light is assessed using the 45-degree guide many councils use.
  • The new roof is tied into the old one, so roof tiles and ridge details need to match.

What are the steps?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

How long does a two-storey extension take?

Around 14 to 24 weeks on site, plus the planning period before that.

Will we need to move out?

Most people stay. The noisiest stage is when we break through into the existing first floor, which we plan for a short window.

Who deals with the council for a project in Vale of Leven?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Double-storey extensions in nearby towns

Learn more about double-storey extensions, or see every project we cover in Vale of Leven.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote