What is a double-storey extension?
A double-storey extension adds new rooms on both the ground and first floor in one build, typically a larger kitchen or living space downstairs and an extra bedroom or bathroom above. Because the roof and foundations are shared, the cost per square metre is usually lower than a single-storey extension.
- Measured survey, design and planning drawings
- Structural engineer’s design and calculations
- Joining the new first floor to the existing landing
How much should I budget for a double-storey extension?
Typical ranges for double-storey extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Double-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,850 per m² |
What approvals does a double-storey extension need in England?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission. Expect around eight weeks for a decision once the application is validated.
What should I think about before starting?
- Neighbours’ light is assessed using the 45-degree guide many councils use.
- The first-floor link can mean moving a bathroom or reshaping the landing.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
Does a two-storey extension need planning permission?
Usually yes. In England some two-storey rear extensions are permitted development, but side extensions over one storey always need planning permission.
How long does a two-storey extension take?
Around 14 to 24 weeks on site, plus the planning period before that.
Do you work in Hayes?
Yes. Hayes is within our coverage for double-storey extensions, along with nearby Southall and Heston.
Double-storey extensions near Hayes
- Double-storey extensions in Southall
- Double-storey extensions in Heston
- Double-storey extensions in Greenford
- Double-storey extensions in Northolt
Learn more about double-storey extensions, or see every project we cover in Hayes.