Covering Southall
We work in Southall (UB1) and the places around it, including Greenford, Heston and Hayes.
Homes in London
Much of London’s housing is Victorian and Edwardian terraces, which is why side return extensions, rear dormers and mansards are so common. Many streets are in conservation areas, and several boroughs use Article 4 directions that remove some permitted development rights.
What does a double-storey extension involve?
A double-storey extension adds new rooms on both the ground and first floor in one build, typically a larger kitchen or living space downstairs and an extra bedroom or bathroom above. Because the roof and foundations are shared, the cost per square metre is usually lower than a single-storey extension.
- Householder planning application
- Foundations, steelwork, brick and block walls, roof
- Windows, insulation, plastering, electrics and plumbing
How much does a double-storey extension cost in Southall?
Guide prices for double-storey extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Double-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,850 per m² |
What approvals does a double-storey extension need in England?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission. Expect around eight weeks for a decision once the application is validated.
What can affect a double-storey extension?
- Side extensions close to a boundary are often set back or stepped down so they do not create a terraced effect.
- The new roof is tied into the old one, so roof tiles and ridge details need to match.
What are the steps?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
What people ask before starting
Is a two-storey extension better value than a single-storey one?
Per square metre, usually yes, because the foundations and roof serve two floors of space.
How long does a two-storey extension take?
Around 14 to 24 weeks on site, plus the planning period before that.
How do I get a price for double-storey extensions in Southall?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Double-storey extensions near Southall
- Double-storey extensions in Greenford
- Double-storey extensions in Heston
- Double-storey extensions in Hayes
- Double-storey extensions in Isleworth
Learn more about double-storey extensions, or see every project we cover in Southall.