Double-storey extensions · Newcastle-under-Lyme

Double-storey extensions in Newcastle-under-Lyme

We take on double-storey extensions in Newcastle-under-Lyme as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Newcastle-under-Lyme

Newcastle-under-Lyme is about 2 miles west of Stoke-on-Trent. We also cover Stoke-on-Trent (2 miles to the east), Longton and Kidsgrove.

Homes in the West Midlands

The West Midlands has a large stock of 1930s semis and Victorian terraces in red brick, so matching brick and roof tiles is often the key to an extension that looks original.

What is included in a double-storey extension in Newcastle-under-Lyme?

A double-storey extension adds new rooms on both the ground and first floor in one build, typically a larger kitchen or living space downstairs and an extra bedroom or bathroom above. Because the roof and foundations are shared, the cost per square metre is usually lower than a single-storey extension.

  • Structural engineer’s design and calculations
  • Foundations, steelwork, brick and block walls, roof
  • Joining the new first floor to the existing landing

How much should I budget for a double-storey extension?

Typical ranges for double-storey extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Double-storey extensionsGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,850 per m²

Do you need permission for a double-storey extension in Newcastle-under-Lyme?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission.

What should I think about before starting?

  • Side extensions close to a boundary are often set back or stepped down so they do not create a terraced effect.
  • Neighbours’ light is assessed using the 45-degree guide many councils use.

What are the steps?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Questions about a double-storey extension in Newcastle-under-Lyme

Is a two-storey extension better value than a single-storey one?

Per square metre, usually yes, because the foundations and roof serve two floors of space.

How long does a two-storey extension take?

Around 14 to 24 weeks on site, plus the planning period before that.

Do you work in Newcastle-under-Lyme?

Yes. Newcastle-under-Lyme is within our coverage for double-storey extensions, along with nearby Stoke-on-Trent and Longton.

Double-storey extensions in nearby towns

Learn more about double-storey extensions, or see every project we cover in Newcastle-under-Lyme.