Double-storey extensions · Staffordshire

Double-storey extensions in Staffordshire

We design and build double-storey extensions throughout Staffordshire, with a fixed price in writing for the agreed specification and one point of contact.

Covering Staffordshire

Our double-storey extensions service in Staffordshire covers Stoke-on-Trent, Newcastle-under-Lyme, Burton upon Trent and Cannock and more.

Homes in the West Midlands

Across the West Midlands, terraced and semi-detached houses in red brick are typical, along with post-war estates where garage conversions and side extensions are popular.

What does a double-storey extension involve?

A double-storey extension adds new rooms on both the ground and first floor in one build, typically a larger kitchen or living space downstairs and an extra bedroom or bathroom above. Because the roof and foundations are shared, the cost per square metre is usually lower than a single-storey extension.

  • Structural engineer’s design and calculations
  • Foundations, steelwork, brick and block walls, roof
  • Windows, insulation, plastering, electrics and plumbing

What will a double-storey extension cost?

What double-storey extensions typically cost. These are guide ranges; the written quote for your house replaces them.

Double-storey extensionsGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,850 per m²

What approvals does a double-storey extension need in England?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission. Expect around eight weeks for a decision once the application is validated.

What can affect a double-storey extension?

  • Side extensions close to a boundary are often set back or stepped down so they do not create a terraced effect.
  • The new roof is tied into the old one, so roof tiles and ridge details need to match.

From first call to completion

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Double-storey extensions: common questions

Is a two-storey extension better value than a single-storey one?

Per square metre, usually yes, because the foundations and roof serve two floors of space.

How long does a two-storey extension take?

Around 14 to 24 weeks on site, plus the planning period before that.

Can you visit a house in Staffordshire to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Also covering

Learn more about double-storey extensions, or see every project we cover in Staffordshire.