Covering Shipley
We work in Shipley (BD18) and the places around it, including Bradford, Guiseley and Yeadon.
Homes in Yorkshire and the Humber
Stone-built terraces are typical of many West Yorkshire towns, while red brick dominates in Hull and much of South Yorkshire, so matching materials is a big part of designing an extension here.
What is included in a double-storey extension in Shipley?
Two-storey work has to sit comfortably with the house and the neighbours, so most of the design effort goes into the roofline, window positions and how the new first floor connects to the landing. We handle the planning application, the structural design and the building control process, then build, roof and finish both floors.
- Householder planning application
- Foundations, steelwork, brick and block walls, roof
- Windows, insulation, plastering, electrics and plumbing
How much should I budget for a double-storey extension?
Use these ranges to budget for double-storey extensions; the survey turns them into a fixed price for the agreed specification.
| Double-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,850 per m² |
How is a double-storey extension approved in Shipley?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission. Expect around eight weeks for a decision once the application is validated.
What should I think about before starting?
- Side extensions close to a boundary are often set back or stepped down so they do not create a terraced effect.
- The first-floor link can mean moving a bathroom or reshaping the landing.
What are the steps?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
What people ask before starting
Is a two-storey extension better value than a single-storey one?
Per square metre, usually yes, because the foundations and roof serve two floors of space.
How long does a two-storey extension take?
Around 14 to 24 weeks on site, plus the planning period before that.
Can you visit a house in Shipley to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Also covering
- Double-storey extensions in Bradford
- Double-storey extensions in Guiseley
- Double-storey extensions in Yeadon
- Double-storey extensions in Pudsey
Learn more about double-storey extensions, or see every project we cover in Shipley.

