Double-storey extensions · Shrewsbury

Double-storey extensions in Shrewsbury

Planning double-storey extensions in Shrewsbury? We design and build them for houses across Shropshire, and we fix the price for the agreed specification in writing before any building work starts.

Covering Shrewsbury

Shrewsbury sits 13 miles west of Telford, with Wellington 10 miles to the east and Telford 13 miles to the east.

Homes in the West Midlands

Red-brick terraces and inter-war semis make up much of the housing in the West Midlands, which suits rear extensions, dormer lofts and hip-to-gable conversions, with more modern estates on the edges of the towns.

What do you get with a double-storey extension?

A double-storey extension adds new rooms on both the ground and first floor in one build, typically a larger kitchen or living space downstairs and an extra bedroom or bathroom above. Because the roof and foundations are shared, the cost per square metre is usually lower than a single-storey extension.

  • Measured survey, design and planning drawings
  • Structural engineer’s design and calculations
  • Foundations, steelwork, brick and block walls, roof

How much should I budget for a double-storey extension?

Use these ranges to budget for double-storey extensions; the survey turns them into a fixed price for the agreed specification.

Double-storey extensionsGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,850 per m²

Planning and building rules in Shrewsbury

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission. Expect around eight weeks for a decision once the application is validated.

What should I think about before starting?

  • The new roof is tied into the old one, so roof tiles and ridge details need to match.
  • The first-floor link can mean moving a bathroom or reshaping the landing.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

How long does a two-storey extension take?

Around 14 to 24 weeks on site, plus the planning period before that.

Will we need to move out?

Most people stay. The noisiest stage is when we break through into the existing first floor, which we plan for a short window.

How do I get a price for double-storey extensions in Shrewsbury?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Other towns nearby

Learn more about double-storey extensions, or see every project we cover in Shrewsbury.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote