Covering Battersea
Battersea is about 3 miles south-west of London. We also cover Chelsea (1 miles to the north-west), Fulham and Brixton.
Homes in London
Much of London’s housing is Victorian and Edwardian terraces, which is why side return extensions, rear dormers and mansards are so common. Many streets are in conservation areas, and several boroughs use Article 4 directions that remove some permitted development rights.
What is included in a garden annexe in Battersea?
A garden annexe is a separate single-storey building in the grounds of a house with its own bedroom, bathroom and kitchenette, used by family members as part of the main household. Unlike a garden office, an annexe that people sleep in normally needs planning permission and full building regulations approval.
- Design and planning application
- Foundations and drainage connections
- Kitchenette and shower room
What will a garden annexe cost?
Use these ranges to budget for garden annexes; the survey turns them into a fixed price for the agreed specification.
| Garden annexes | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,900 per m² |
Planning and building rules in Battersea
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
A self-contained annexe used for sleeping and living normally needs planning permission in England. Permitted development for outbuildings does not cover living accommodation.
What can change the price or programme?
- The annexe normally has to remain part of the main household, not let as a separate home.
- Drainage may need a pump if the garden falls away from the sewer.
What are the steps?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Garden annexes: common questions
Do I need planning permission for a garden annexe?
Usually yes, because people will sleep in it. Outbuilding permitted development does not cover living accommodation.
How long does an annexe take to build?
About 14 to 24 weeks on site after approvals.
Do you work in Battersea?
Yes. Battersea is within our coverage for garden annexes, along with nearby Chelsea and Fulham.
Garden annexes near Battersea
Learn more about garden annexes, or see every project we cover in Battersea.

