Covering Canning Town
Our coverage around Canning Town (E16) also includes Stratford (2 miles to the north-west) and Bow.
Homes in London
Terraced houses dominate many London neighbourhoods, so most projects involve shared walls, narrow access and a party wall process. Conservation areas are widespread, and some boroughs have their own mansard and basement guidance.
What is a garden annexe?
A garden annexe is a separate single-storey building in the grounds of a house with its own bedroom, bathroom and kitchenette, used by family members as part of the main household. Unlike a garden office, an annexe that people sleep in normally needs planning permission and full building regulations approval.
- Design and planning application
- Brick, block or timber-frame structure
- Heating, hot water and electrics
How much does a garden annexe cost in Canning Town?
Use these ranges to budget for garden annexes; the survey turns them into a fixed price for the agreed specification.
| Garden annexes | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,900 per m² |
What approvals does a garden annexe need in England?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
A self-contained annexe used for sleeping and living normally needs planning permission in England. Permitted development for outbuildings does not cover living accommodation.
What can change the price or programme?
- Drainage may need a pump if the garden falls away from the sewer.
- A level threshold and wider doors make the annexe suitable for later life.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
How long does an annexe take to build?
About 14 to 24 weeks on site after approvals.
Can you make it wheelchair accessible?
Yes. Level access, wider doors and a level-access shower can be designed in from the start.
How do I get a price for garden annexes in Canning Town?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Garden annexes in nearby towns
- Garden annexes in Stratford
- Garden annexes in Bow
- Garden annexes in Greenwich
- Garden annexes in Barking
Learn more about garden annexes, or see every project we cover in Canning Town.

