Covering Hamilton
Our coverage around Hamilton (ML3) also includes Motherwell (2 miles to the north-east) and Wishaw.
Homes in Lanarkshire
Housing in Scotland includes tenements in the cities, sandstone villas, inter-war and post-war semis and a large number of bungalows, which often suit dormer and upward extensions.
What is a garden annexe?
We design annexes as permanent buildings with proper foundations, insulation and services, and we prepare the planning case showing how the annexe will be used as part of the main home. Connections for water, drainage and power are planned from the start.
- Building warrant application and completion certificate
- Foundations and drainage connections
- Accessible design options for older relatives
What is the guide price for a garden annexe in Hamilton?
Use these ranges to budget for garden annexes; the survey turns them into a fixed price for the agreed specification.
| Garden annexes | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,900 per m² |
What approvals does a garden annexe need in Scotland?
Scottish projects follow a different process from England: the council issues a building warrant before work starts and accepts a completion certificate at the end, alongside any planning permission needed. We prepare both applications.
In Scotland an annexe needs planning permission and a building warrant before work starts.
What can affect a garden annexe?
- The annexe normally has to remain part of the main household, not let as a separate home.
- A level threshold and wider doors make the annexe suitable for later life.
What happens after I enquire?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
What people ask before starting
Can I rent the annexe out?
Usually not without a separate planning permission, because councils normally require it to stay part of the main house.
How long does an annexe take to build?
About 14 to 24 weeks on site after approvals.
Do you work in Hamilton?
Yes. Hamilton is within our coverage for garden annexes, along with nearby Motherwell and Wishaw.
Garden annexes in nearby towns
- Garden annexes in Motherwell
- Garden annexes in Wishaw
- Garden annexes in East Kilbride
- Garden annexes in Cambuslang
Learn more about garden annexes, or see every project we cover in Hamilton.

