Garden annexes · Hayes

Garden annexes in Hayes

We take on garden annexes in Hayes as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Hayes

Alongside Hayes, we also cover Southall, Heston (3 miles to the south-east) and Greenford.

Homes in London

London projects often mean working on period terraces with neighbours on both sides, tight access through the house and conservation area controls, so careful planning and party wall work matter as much as the build.

What goes into a garden annexe?

We design annexes as permanent buildings with proper foundations, insulation and services, and we prepare the planning case showing how the annexe will be used as part of the main home. Connections for water, drainage and power are planned from the start.

  • Design and planning application
  • Brick, block or timber-frame structure
  • Heating, hot water and electrics

What is the guide price for a garden annexe in Hayes?

What garden annexes typically cost. These are guide ranges; the written quote for your house replaces them.

Garden annexesGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,900 per m²

Planning and building rules in Hayes

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

A self-contained annexe used for sleeping and living normally needs planning permission in England.

What should Hayes homeowners check first?

  • Drainage may need a pump if the garden falls away from the sewer.
  • Council tax treatment depends on who lives there; check with your council.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

What people ask before starting

How long does an annexe take to build?

About 14 to 24 weeks on site after approvals.

Can you make it wheelchair accessible?

Yes. Level access, wider doors and a level-access shower can be designed in from the start.

Do you work in Hayes?

Yes. Hayes is within our coverage for garden annexes, along with nearby Southall and Heston.

Other towns nearby

Learn more about garden annexes, or see every project we cover in Hayes.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote