Covering Leicester
Our coverage around Leicester (LE1, LE19) also includes Oadby, Wigston and Loughborough.
Homes in the East Midlands
Housing in the East Midlands includes Victorian terraces, inter-war semis and newer estates, with stone-built villages in some areas where conservation controls apply.
What do you get with a garden annexe?
We design annexes as permanent buildings with proper foundations, insulation and services, and we prepare the planning case showing how the annexe will be used as part of the main home. Connections for water, drainage and power are planned from the start.
- Foundations and drainage connections
- Heating, hot water and electrics
- Accessible design options for older relatives
What is the guide price for a garden annexe in Leicester?
Guide prices for garden annexes, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Garden annexes | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,900 per m² |
What approvals does a garden annexe need in England?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
A self-contained annexe used for sleeping and living normally needs planning permission in England.
What can affect a garden annexe?
- The annexe normally has to remain part of the main household, not let as a separate home.
- A level threshold and wider doors make the annexe suitable for later life.
From first call to completion
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Garden annexes: common questions
Can I rent the annexe out?
Usually not without a separate planning permission, because councils normally require it to stay part of the main house.
How long does an annexe take to build?
About 14 to 24 weeks on site after approvals.
Do you work in Leicester?
Yes. Leicester is within our coverage for garden annexes, along with nearby Oadby and Wigston.
Garden annexes in nearby towns
- Garden annexes in Oadby
- Garden annexes in Wigston
- Garden annexes in Loughborough
- Garden annexes in Coalville
Learn more about garden annexes, or see every project we cover in Leicester.

