Covering Linlithgow
Our coverage around Linlithgow (EH49) also includes Grangemouth (5 miles to the north-west) and Bathgate.
Homes in the Lothians
In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.
What do you get with a garden annexe?
We design annexes as permanent buildings with proper foundations, insulation and services, and we prepare the planning case showing how the annexe will be used as part of the main home. Connections for water, drainage and power are planned from the start.
- Design and planning application
- Foundations and drainage connections
- Brick, block or timber-frame structure
What is the guide price for a garden annexe in Linlithgow?
What garden annexes typically cost. These are guide ranges; the written quote for your house replaces them.
| Garden annexes | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,900 per m² |
How is a garden annexe approved in Linlithgow?
Scottish projects follow a different process from England: the council issues a building warrant before work starts and accepts a completion certificate at the end, alongside any planning permission needed. We prepare both applications.
In Scotland an annexe needs planning permission and a building warrant before work starts.
What can affect a garden annexe?
- A level threshold and wider doors make the annexe suitable for later life.
- Council tax treatment depends on who lives there; check with your council.
What are the steps?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
Do I need planning permission for a garden annexe?
Usually yes, because people will sleep in it. Outbuilding permitted development does not cover living accommodation.
How long does an annexe take to build?
About 14 to 24 weeks on site after approvals.
Do you work in Linlithgow?
Yes. Linlithgow is within our coverage for garden annexes, along with nearby Grangemouth and Bathgate.
Garden annexes in nearby towns
- Garden annexes in Grangemouth
- Garden annexes in Bathgate
- Garden annexes in Livingston
- Garden annexes in Falkirk
Learn more about garden annexes, or see every project we cover in Linlithgow.

