Covering Lisnaskea
Alongside Lisnaskea, we also cover Enniskillen, Omagh (25 miles to the north) and Keady.
Projects in County Fermanagh are taken on by arrangement, and any travel and accommodation costs for the team are shown openly in the quote.
Homes in County Fermanagh
Northern Ireland has a high proportion of detached houses and bungalows outside the cities, which often suit side extensions, rear extensions and upward extensions.
What goes into a garden annexe?
A garden annexe is a separate single-storey building in the grounds of a house with its own bedroom, bathroom and kitchenette, used by family members as part of the main household. Unlike a garden office, an annexe that people sleep in normally needs planning permission and full building regulations approval.
- Design and planning application
- Brick, block or timber-frame structure
- Heating, hot water and electrics
How much should I budget for a garden annexe?
Typical ranges for garden annexes. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Garden annexes | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,900 per m² |
Planning and building rules in Lisnaskea
Projects in Northern Ireland need planning clearance from one of the eleven councils and building control approval, also from the council. The Party Wall etc. Act does not extend to Northern Ireland, so work near neighbours is agreed directly and documented carefully.
In Northern Ireland an annexe needs planning permission and building control approval.
What should Lisnaskea homeowners check first?
- A level threshold and wider doors make the annexe suitable for later life.
- Council tax treatment depends on who lives there; check with your council.
What happens after I enquire?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
What people ask before starting
How long does an annexe take to build?
About 14 to 24 weeks on site after approvals.
Can you make it wheelchair accessible?
Yes. Level access, wider doors and a level-access shower can be designed in from the start.
Do you work in Lisnaskea?
Yes. Lisnaskea is within our coverage for garden annexes, along with nearby Enniskillen and Omagh.
Garden annexes near Lisnaskea
Learn more about garden annexes, or see every project we cover in Lisnaskea.

