Covering Whitley Bay
Whitley Bay sits 8 miles north-east of Newcastle upon Tyne, with North Shields 2 miles to the south and Tynemouth 2 miles to the south-east.
Homes in the North East
The North East has terraced housing including Tyneside flats, inter-war semis and post-war estates, so loft conversions, rear extensions and layout changes are popular ways to add space.
What do you get with a garden annexe?
A garden annexe is a separate single-storey building in the grounds of a house with its own bedroom, bathroom and kitchenette, used by family members as part of the main household. Unlike a garden office, an annexe that people sleep in normally needs planning permission and full building regulations approval.
- Design and planning application
- Foundations and drainage connections
- Kitchenette and shower room
What will a garden annexe cost?
Indicative costs for garden annexes. London and the South East usually sit towards the top of each range.
| Garden annexes | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,900 per m² |
What approvals does a garden annexe need in England?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
A self-contained annexe used for sleeping and living normally needs planning permission in England. Permitted development for outbuildings does not cover living accommodation.
What can affect a garden annexe?
- Drainage may need a pump if the garden falls away from the sewer.
- Council tax treatment depends on who lives there; check with your council.
How does the project run?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Your questions answered
Can I rent the annexe out?
Usually not without a separate planning permission, because councils normally require it to stay part of the main house.
How long does an annexe take to build?
About 14 to 24 weeks on site after approvals.
Who deals with the council for a project in Whitley Bay?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Garden annexes in nearby towns
- Garden annexes in North Shields
- Garden annexes in Tynemouth
- Garden annexes in South Shields
- Garden annexes in Jarrow
Learn more about garden annexes, or see every project we cover in Whitley Bay.

