Covering Yeadon
Our coverage around Yeadon (LS19) also includes Guiseley (1 miles to the north-west) and Shipley.
Homes in Yorkshire and the Humber
Yorkshire has a strong mix of stone terraces, red-brick semis and modern estates, plus conservation areas in many historic towns and villages.
What is included in a garden annexe in Yeadon?
We design annexes as permanent buildings with proper foundations, insulation and services, and we prepare the planning case showing how the annexe will be used as part of the main home. Connections for water, drainage and power are planned from the start.
- Brick, block or timber-frame structure
- Kitchenette and shower room
- Accessible design options for older relatives
How much should I budget for a garden annexe?
Use these ranges to budget for garden annexes; the survey turns them into a fixed price for the agreed specification.
| Garden annexes | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,900 per m² |
How is a garden annexe approved in Yeadon?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
A self-contained annexe used for sleeping and living normally needs planning permission in England. Permitted development for outbuildings does not cover living accommodation.
What can change the price or programme?
- The annexe normally has to remain part of the main household, not let as a separate home.
- Council tax treatment depends on who lives there; check with your council.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Questions about a garden annexe in Yeadon
Do I need planning permission for a garden annexe?
Usually yes, because people will sleep in it. Outbuilding permitted development does not cover living accommodation.
How long does an annexe take to build?
About 14 to 24 weeks on site after approvals.
How do I get a price for garden annexes in Yeadon?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Also covering
- Garden annexes in Guiseley
- Garden annexes in Shipley
- Garden annexes in Pudsey
- Garden annexes in Bradford
Learn more about garden annexes, or see every project we cover in Yeadon.

