Our coverage around Eastleigh (SO50, SO97) also includes Southampton (5 miles to the south-west) and Winchester.
Homes in the South East
Housing across the South East mixes inter-war semis, post-war estates and older cottages in villages and market towns, so rear and side extensions, hip-to-gable lofts and garage conversions all come up regularly.
What goes into a house renovation?
We survey the house to find what really needs doing, from damp and roof condition to wiring age, then programme the work so the messy trades (structure, first-fix, plaster) happen before the finishing trades. A single contract avoids the gaps that appear when separate trades are booked independently.
- Strip-out and structural repairs
- Rewiring, heating and plumbing
- Plastering, joinery, kitchen and bathrooms
How much should I budget for a house renovation?
Guide prices for house renovations, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| House renovations | Guide price incl. VAT |
|---|---|
| Light refurbishment | £600 to £1,000 per m² |
| Full renovation | £1,000 to £1,800 per m² |
| Structural renovation and remodel | £1,800 to £2,800 per m² |
Do you need permission for a house renovation in Eastleigh?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
Internal work like this does not usually need planning permission unless the house is listed or your permitted development rights have been removed.
What should Eastleigh homeowners check first?
- Older houses can hide timber decay and damp, so we allow a contingency.
- Energy upgrades are cheapest when walls and floors are already opened up.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
How long does a renovation take?
About 8 to 30 weeks on site depending on scope.
Do you handle the building control side?
Yes. We apply for and arrange inspections for everything that needs approval.
Who deals with the council for a project in Eastleigh?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
House renovations in nearby towns
- House renovations in Southampton
- House renovations in Winchester
- House renovations in Totton
- House renovations in Fareham
Learn more about house renovations, or see every project we cover in Eastleigh.