House renovations · Stranraer

House renovations in Stranraer

Homeowners in Stranraer can get house renovations from one company: the design, the paperwork and the building work sit with us rather than with three separate firms.

Covering Stranraer

Stranraer sits 57 miles west of Dumfries, with Bangor 30 miles to the south-west and Carrickfergus 34 miles to the west.

Because Dumfries and Galloway covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.

Homes in Dumfries and Galloway

Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.

What is a house renovation?

A house renovation brings an older or neglected home up to modern standards: rewiring, new heating, replastering, new kitchen and bathrooms, windows, insulation and often a new layout. It can be done room by room or as one programme while the house is empty.

  • Condition survey and scope of works
  • Strip-out and structural repairs
  • Insulation and energy upgrades

How much should I budget for a house renovation?

Guide prices for house renovations, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

House renovationsGuide price incl. VAT
Light refurbishment£600 to £1,000 per m²
Full renovation£1,000 to £1,800 per m²
Structural renovation and remodel£1,800 to £2,800 per m²

Planning and building rules in Stranraer

Scottish projects follow a different process from England: the council issues a building warrant before work starts and accepts a completion certificate at the end, alongside any planning permission needed. We prepare both applications.

Internal alterations rarely need planning permission in Scotland, but structural work needs a building warrant before it starts.

What can change the price or programme?

  • Older houses can hide timber decay and damp, so we allow a contingency.
  • Energy upgrades are cheapest when walls and floors are already opened up.

What are the steps?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Questions about a house renovation in Stranraer

How long does a renovation take?

About 8 to 30 weeks on site depending on scope.

Do you handle the building control side?

Yes. We apply for and arrange inspections for everything that needs approval.

Do you work in Stranraer?

Yes. Stranraer is within our coverage for house renovations, along with nearby Bangor and Carrickfergus.

House renovations near Stranraer

Learn more about house renovations, or see every project we cover in Stranraer.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote