Covering Aberdeen
Our coverage around Aberdeen (AB10, AB11, AB12) also includes Stonehaven, Inverurie and Banchory.
Homes in Aberdeen and Aberdeenshire
In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.
What goes into a house-to-flat conversion?
We assess the house against the council’s policies on flat sizes, parking, bins and cycle storage before any design work, then design layouts to the space standards your council uses. On site the critical work is fire separation, sound insulation between floors, separate services and meters, and protected escape routes.
- Planning application and layouts to space standards
- Kitchens, bathrooms and finishes
- Bin, cycle and amenity space works
What is the guide price for a house-to-flat conversion in Aberdeen?
What house-to-flat conversions typically cost. These are guide ranges; the written quote for your house replaces them.
Priced on survey.
What approvals does a house-to-flat conversion need in Scotland?
Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.
This needs planning permission and a building warrant from your council in Scotland before work starts. We prepare both applications.
What should Aberdeen homeowners check first?
- Some councils restrict the loss of family houses or limit flat conversions in certain streets.
- Sound insulation between flats is tested on completion.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
Does converting a house into flats need planning permission?
Yes, always. Subdividing a house into flats is development under planning law.
What are the main building regulations issues?
Fire separation between flats, protected escape routes, sound insulation and separate services.
Who deals with the council for a project in Aberdeen?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Other towns nearby
- House-to-flat conversions in Stonehaven
- House-to-flat conversions in Inverurie
- House-to-flat conversions in Banchory
- House-to-flat conversions in Peterhead
Learn more about house-to-flat conversions, or see every project we cover in Aberdeen.

