Covering Arbroath
We work in Arbroath (DD11) and the places around it, including Carnoustie, Montrose and Forfar.
Homes in Dundee and Angus
Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.
What does a knock down and rebuild involve?
Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.
- Planning application for the replacement dwelling
- Demolition and site clearance
- New foundations, structure and full fit-out
How much does a knock down and rebuild cost in Arbroath?
What knock down and rebuild typically cost. These are guide ranges; the written quote for your house replaces them.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
Planning and building rules in Arbroath
Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.
This needs planning permission and a building warrant from your council in Scotland before work starts.
What should I think about before starting?
- You will need somewhere to live for most of a year.
- Planning policy on replacement dwellings varies, especially in green belt and countryside.
What are the steps?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Knock down and rebuild: common questions
Do I need planning permission?
Yes, for the replacement dwelling.
How long does it take?
Around 36 to 60 weeks including demolition.
Do you work in Arbroath?
Yes. Arbroath is within our coverage for knock down and rebuild, along with nearby Carnoustie and Montrose.
Knock down and rebuild in nearby towns
- Knock down and rebuild in Carnoustie
- Knock down and rebuild in Montrose
- Knock down and rebuild in Forfar
- Knock down and rebuild in Dundee
Learn more about knock down and rebuild, or see every project we cover in Arbroath.

