Carnoustie is about 11 miles east of Dundee. We also cover Arbroath (6 miles to the north-east), Dundee and St Andrews.
Homes in Dundee and Angus
Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.
What do you get with a knock down and rebuild?
Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.
- Planning application for the replacement dwelling
- Asbestos survey, demolition notice and service disconnections
- Demolition and site clearance
What will a knock down and rebuild cost?
Typical ranges for knock down and rebuild. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
Do you need permission for a knock down and rebuild in Carnoustie?
Scottish projects follow a different process from England: the council issues a building warrant before work starts and accepts a completion certificate at the end, alongside any planning permission needed. We prepare both applications.
This needs planning permission and a building warrant from your council in Scotland before work starts. We prepare both applications.
What can affect a knock down and rebuild?
- A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
- You will need somewhere to live for most of a year.
From first call to completion
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Questions about a knock down and rebuild in Carnoustie
Do I need planning permission?
Yes, for the replacement dwelling.
How long does it take?
Around 36 to 60 weeks including demolition.
Can you visit a house in Carnoustie to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Knock down and rebuild in nearby towns
- Knock down and rebuild in Arbroath
- Knock down and rebuild in Dundee
- Knock down and rebuild in St Andrews
- Knock down and rebuild in Forfar
Learn more about knock down and rebuild, or see every project we cover in Carnoustie.