Knock down and rebuild · Bath

Knock down and rebuild in Bath

From the first site visit to the final building control sign-off, we manage knock down and rebuild in Bath so you only have one company to deal with.

Covering Bath

Our coverage around Bath (BA1) also includes Trowbridge (8 miles to the south-east) and Kingswood.

Homes in the South West

In the South West, matching local stone, render or slate is often the main design question, and conservation areas and listed buildings are common in historic towns.

What is a knock down and rebuild?

We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.

  • Asbestos survey, demolition notice and service disconnections
  • Demolition and site clearance
  • New foundations, structure and full fit-out

What will a knock down and rebuild cost?

Indicative costs for knock down and rebuild. London and the South East usually sit towards the top of each range.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

Do you need permission for a knock down and rebuild in Bath?

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.

What can change the price or programme?

  • A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
  • You will need somewhere to live for most of a year.

From first call to completion

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

How long does it take?

Around 36 to 60 weeks including demolition.

What happens about asbestos?

An asbestos survey is done before demolition and any asbestos is removed safely first.

How do I get a price for knock down and rebuild in Bath?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Also covering

Learn more about knock down and rebuild, or see every project we cover in Bath.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote