Knock down and rebuild · Berkshire

Knock down and rebuild in Berkshire

We design and build knock down and rebuild throughout Berkshire, with a fixed price in writing for the agreed specification and one point of contact.

Covering Berkshire

Our knock down and rebuild service in Berkshire covers Reading, Slough, Bracknell and Maidenhead and more.

Homes in the South East

Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.

What does a knock down and rebuild involve?

We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.

  • Feasibility: rebuild versus extend and renovate
  • Demolition and site clearance
  • New foundations, structure and full fit-out

How much does a knock down and rebuild cost in Berkshire?

Use these ranges to budget for knock down and rebuild; the survey turns them into a fixed price for the agreed specification.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

What approvals does a knock down and rebuild need in England?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.

What should Berkshire homeowners check first?

  • A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
  • Asbestos is common in post-war houses and must be removed by licensed contractors where required.

What happens after I enquire?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Knock down and rebuild: common questions

Is it cheaper to knock down and rebuild or renovate?

It depends on the existing house. Where a house needs major structural work and a large extension, rebuilding can be similar cost and gives a better result. We compare both at feasibility.

What happens about asbestos?

An asbestos survey is done before demolition and any asbestos is removed safely first.

Do you work in Berkshire?

Yes. Berkshire is within our coverage for knock down and rebuild, along with nearby Reading and Slough.

Knock down and rebuild near Berkshire

Learn more about knock down and rebuild, or see every project we cover in Berkshire.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote