Knock down and rebuild · Chadderton

Knock down and rebuild in Chadderton

If you live in Chadderton and want knock down and rebuild, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering Chadderton

Our coverage around Chadderton (OL9) also includes Oldham, Royton and Middleton.

Homes in the North West

Across the North West, Victorian terraces, inter-war semis and modern estates all feature, and brick or stone matching is chosen to suit each street.

What do you get with a knock down and rebuild?

Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.

  • Feasibility: rebuild versus extend and renovate
  • Planning application for the replacement dwelling
  • Asbestos survey, demolition notice and service disconnections

What is the guide price for a knock down and rebuild in Chadderton?

Guide prices for knock down and rebuild, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

Do you need permission for a knock down and rebuild in Chadderton?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

This needs full planning permission from the council.

What should Chadderton homeowners check first?

  • Planning policy on replacement dwellings varies, especially in green belt and countryside.
  • Asbestos is common in post-war houses and must be removed by licensed contractors where required.

What are the steps?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Your questions answered

Do I need planning permission?

Yes, for the replacement dwelling.

What happens about asbestos?

An asbestos survey is done before demolition and any asbestos is removed safely first.

Who deals with the council for a project in Chadderton?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Knock down and rebuild in nearby towns

Learn more about knock down and rebuild, or see every project we cover in Chadderton.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote