Covering Chelsea
Our coverage around Chelsea (SW3, SW10) also includes Battersea (1 miles to the south-east) and Fulham.
Homes in London
Much of London’s housing is Victorian and Edwardian terraces, which is why side return extensions, rear dormers and mansards are so common. Many streets are in conservation areas, and several boroughs use Article 4 directions that remove some permitted development rights.
What does a knock down and rebuild involve?
We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.
- Asbestos survey, demolition notice and service disconnections
- Demolition and site clearance
- Reconnection of services and landscaping
What is the guide price for a knock down and rebuild in Chelsea?
Indicative costs for knock down and rebuild. London and the South East usually sit towards the top of each range.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
Do you need permission for a knock down and rebuild in Chelsea?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.
What can affect a knock down and rebuild?
- Planning policy on replacement dwellings varies, especially in green belt and countryside.
- Asbestos is common in post-war houses and must be removed by licensed contractors where required.
From first call to completion
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Questions about a knock down and rebuild in Chelsea
How long does it take?
Around 36 to 60 weeks including demolition.
What happens about asbestos?
An asbestos survey is done before demolition and any asbestos is removed safely first.
Who deals with the council for a project in Chelsea?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Also covering
- Knock down and rebuild in Battersea
- Knock down and rebuild in Fulham
- Knock down and rebuild in Notting Hill
- Knock down and rebuild in Shepherd's Bush
Learn more about knock down and rebuild, or see every project we cover in Chelsea.

