Knock down and rebuild · Coventry

Knock down and rebuild in Coventry

We take on knock down and rebuild in Coventry as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Coventry

Our coverage around Coventry (CV1) also includes Kenilworth (5 miles to the south-west) and Bedworth.

Homes in the West Midlands

Red-brick terraces and inter-war semis make up much of the housing in the West Midlands, which suits rear extensions, dormer lofts and hip-to-gable conversions, with more modern estates on the edges of the towns.

What is included in a knock down and rebuild in Coventry?

Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.

  • Feasibility: rebuild versus extend and renovate
  • Asbestos survey, demolition notice and service disconnections
  • Demolition and site clearance

What will a knock down and rebuild cost?

What knock down and rebuild typically cost. These are guide ranges; the written quote for your house replaces them.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

What approvals does a knock down and rebuild need in England?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

This needs full planning permission from the council.

What can change the price or programme?

  • A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
  • You will need somewhere to live for most of a year.

What are the steps?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

Is it cheaper to knock down and rebuild or renovate?

It depends on the existing house. Where a house needs major structural work and a large extension, rebuilding can be similar cost and gives a better result. We compare both at feasibility.

What happens about asbestos?

An asbestos survey is done before demolition and any asbestos is removed safely first.

How do I get a price for knock down and rebuild in Coventry?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Knock down and rebuild near Coventry

Learn more about knock down and rebuild, or see every project we cover in Coventry.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote