Knock down and rebuild · West Midlands

Knock down and rebuild in the West Midlands

Homeowners across the West Midlands can get knock down and rebuild from one company: the design, the council approvals and the building work.

Covering West Midlands

Our coverage across the West Midlands includes Birmingham, Coventry, Wolverhampton and Dudley.

Homes in the West Midlands

The West Midlands has a large stock of 1930s semis and Victorian terraces in red brick, so matching brick and roof tiles is often the key to an extension that looks original.

What goes into a knock down and rebuild?

We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.

  • Feasibility: rebuild versus extend and renovate
  • Asbestos survey, demolition notice and service disconnections
  • Reconnection of services and landscaping

What will a knock down and rebuild cost?

Typical ranges for knock down and rebuild. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

Do you need permission for a knock down and rebuild in the West Midlands?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

This needs full planning permission from the council.

What can change the price or programme?

  • A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
  • Planning policy on replacement dwellings varies, especially in green belt and countryside.

How does the project run?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Knock down and rebuild: common questions

Is VAT charged on a knock down and rebuild?

Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.

What happens about asbestos?

An asbestos survey is done before demolition and any asbestos is removed safely first.

Do you work in the West Midlands?

Yes. the West Midlands is within our coverage for knock down and rebuild, along with nearby Birmingham and Coventry.

Knock down and rebuild near the West Midlands

Learn more about knock down and rebuild, or see every project we cover in West Midlands.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote