Knock down and rebuild · Cricklewood

Knock down and rebuild in Cricklewood

Planning knock down and rebuild in Cricklewood? We design and build them for houses across London, and we fix the price for the agreed specification in writing before any building work starts.

Covering Cricklewood

Cricklewood sits 5 miles north-west of London, with Kilburn 1 miles to the east and Willesden 2 miles to the south-west.

Homes in London

London projects often mean working on period terraces with neighbours on both sides, tight access through the house and conservation area controls, so careful planning and party wall work matter as much as the build.

What goes into a knock down and rebuild?

Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.

  • Feasibility: rebuild versus extend and renovate
  • Asbestos survey, demolition notice and service disconnections
  • New foundations, structure and full fit-out

What will a knock down and rebuild cost?

Indicative costs for knock down and rebuild. London and the South East usually sit towards the top of each range.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

Do you need permission for a knock down and rebuild in Cricklewood?

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

This needs full planning permission from the council.

What should I think about before starting?

  • You will need somewhere to live for most of a year.
  • Planning policy on replacement dwellings varies, especially in green belt and countryside.

From first call to completion

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

What people ask before starting

Is it cheaper to knock down and rebuild or renovate?

It depends on the existing house. Where a house needs major structural work and a large extension, rebuilding can be similar cost and gives a better result. We compare both at feasibility.

How long does it take?

Around 36 to 60 weeks including demolition.

Do you work in Cricklewood?

Yes. Cricklewood is within our coverage for knock down and rebuild, along with nearby Kilburn and Willesden.

Also covering

Learn more about knock down and rebuild, or see every project we cover in Cricklewood.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote