Knock down and rebuild · Dagenham

Knock down and rebuild in Dagenham

We take on knock down and rebuild in Dagenham as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Dagenham

Alongside Dagenham, we also cover Becontree, Romford (2 miles to the north-east) and Hornchurch.

Homes in London

Terraced houses dominate many London neighbourhoods, so most projects involve shared walls, narrow access and a party wall process. Conservation areas are widespread, and some boroughs have their own mansard and basement guidance.

What is included in a knock down and rebuild in Dagenham?

Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.

  • Feasibility: rebuild versus extend and renovate
  • Planning application for the replacement dwelling
  • Reconnection of services and landscaping

What is the guide price for a knock down and rebuild in Dagenham?

Indicative costs for knock down and rebuild. London and the South East usually sit towards the top of each range.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

What approvals does a knock down and rebuild need in England?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

This needs full planning permission from the council.

What should I think about before starting?

  • A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
  • You will need somewhere to live for most of a year.

What happens after I enquire?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Knock down and rebuild: common questions

Is it cheaper to knock down and rebuild or renovate?

It depends on the existing house. Where a house needs major structural work and a large extension, rebuilding can be similar cost and gives a better result. We compare both at feasibility.

How long does it take?

Around 36 to 60 weeks including demolition.

Do you work in Dagenham?

Yes. Dagenham is within our coverage for knock down and rebuild, along with nearby Becontree and Romford.

Also covering

Learn more about knock down and rebuild, or see every project we cover in Dagenham.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.