Knock down and rebuild · Daventry

Knock down and rebuild in Daventry

From the first site visit to the final building control sign-off, we manage knock down and rebuild in Daventry so you only have one company to deal with.

Covering Daventry

Daventry is about 12 miles west of Northampton. We also cover Rugby (9 miles to the north-west), Towcester and Northampton.

Homes in the East Midlands

Housing in the East Midlands includes Victorian terraces, inter-war semis and newer estates, with stone-built villages in some areas where conservation controls apply.

What goes into a knock down and rebuild?

Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.

  • Planning application for the replacement dwelling
  • Demolition and site clearance
  • Reconnection of services and landscaping

How much does a knock down and rebuild cost in Daventry?

Typical ranges for knock down and rebuild. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

Do you need permission for a knock down and rebuild in Daventry?

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

This needs full planning permission from the council.

What should Daventry homeowners check first?

  • You will need somewhere to live for most of a year.
  • Asbestos is common in post-war houses and must be removed by licensed contractors where required.

What are the steps?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

Is VAT charged on a knock down and rebuild?

Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.

Do I need planning permission?

Yes, for the replacement dwelling.

Can you visit a house in Daventry to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Knock down and rebuild near Daventry

Learn more about knock down and rebuild, or see every project we cover in Daventry.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote