Knock down and rebuild · Towcester

Knock down and rebuild in Towcester

Our knock down and rebuild service covers Towcester and the rest of Northamptonshire. You get a fixed price in writing for the agreed specification, and one person co-ordinating the trades.

Covering Towcester

We work in Towcester (NN12) and the places around it, including Northampton, Buckingham and Brackley.

Homes in the East Midlands

The East Midlands combines red-brick terraces in the cities with a lot of post-war and modern estate housing, so rear extensions, garage conversions and loft conversions are all common.

What do you get with a knock down and rebuild?

Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.

  • Asbestos survey, demolition notice and service disconnections
  • New foundations, structure and full fit-out
  • Reconnection of services and landscaping

How much should I budget for a knock down and rebuild?

Typical ranges for knock down and rebuild. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

Planning and building rules in Towcester

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.

What can change the price or programme?

  • You will need somewhere to live for most of a year.
  • Asbestos is common in post-war houses and must be removed by licensed contractors where required.

What are the steps?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

How long does it take?

Around 36 to 60 weeks including demolition.

What happens about asbestos?

An asbestos survey is done before demolition and any asbestos is removed safely first.

Who deals with the council for a project in Towcester?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Also covering

Learn more about knock down and rebuild, or see every project we cover in Towcester.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote